Back

Project Name: Mohawk Street Improvements

Agency: City of Bakersfield

Prime: Dokken Engineering

Aguirre Budget: $ 266,256

Prevailing Wage Job: Yes.

Project Description:  AGUIRRE & ASSOCIATES set and surveyed a minimum of 10 supplemental control points throughout the project site. The supplemental control points were established from primary project control provided by the City using GPS Static survey procedures in accordance with the Caltrans Survey Manual. AGUIRRE & ASSOCIATES preformed an aerial mapping check throughout the project site from random ground shots collected using GPS RTK survey procedures. Design surveys were performed at various locations as directed by the designer including, but not limited to, cross sections, conform locations, street intersections, potholes and exploratory borings and miscellaneous features.