Project
Name:
Orange
Line Right-of-Way Survey
Agency: Metropolitan Transit Development Board (MTDB)
Prime:
Wiggans & Willett
Aguirre Budget: $ 250,000
Prevailing
Wage Job: Yes.
Project Description: Aguirre & Associates is the survey and mapping subconsultant to MTDB for the General Right-of-Way Consultant contract. One of the on-call duties was for the right-of-way survey and mapping of 15 miles of the Orange Line from the El Cajon station at Palm Avenue to 47th Street in San Diego. Aguirre & Associates performed the right-of-way, set permanent monuments at key locations on the MTDB right-of-way and filed a Record of Survey Map with the County Surveyor. Duties also included the preparation of a right-of-way plan and plats of encroachments along the LRT alignment.