Back

Project Name:  Orange Line Right-of-Way Survey

 Agency: Metropolitan Transit Development Board (MTDB)

 Prime: Wiggans & Willett

Aguirre Budget: $ 250,000

Prevailing Wage Job: Yes.

Project Description: Aguirre & Associates  is the survey and mapping subconsultant to MTDB for the General Right-of-Way Consultant contract.  One of the on-call duties was for the right-of-way survey and mapping of 15 miles of the Orange Line from the El Cajon station at Palm Avenue to 47th Street in San Diego.  Aguirre & Associates performed the right-of-way, set permanent monuments at key locations on the MTDB right-of-way and filed a Record of Survey Map with the County Surveyor.  Duties also included the preparation of a right-of-way plan and plats of encroachments along the LRT alignment.